Our structural design included a concrete sedimentation channel, influent channel, wet well, and pump house. We designed approximately 15,800 feet of 48-inch welded-steel pipe, which required steady state and transient hydraulic modeling, appurtenance design, thrust restraint design, and tie-ins to existing pipelines.
Owner/Client
Parker Water and Sanitation District
Cost
$5.6 million