We developed unique solutions to meet the tight physical and time limit constraints of the renovation. The design and construction team installed two, 25,000 cubic feet per minute (CFM) AHUs that had to be brought into the facility in pieces through a four-foot-wide by 6.5-foot-tall door. These modernizations were made in addition to the original restoration project without any impact to the initial completion date.