We completed a comprehensive condition survey that included an in-depth inspection, material testing, and a rigorous structural analysis. Our survey showed that rehabilitation would not solve long-term durability and feasibility concerns, so we recommended a complete bridge replacement. To pay homage, numerous portions of the newly designed bridge will be reminiscent of the original, including curved and arch-shaped design elements, similar pillars, a hunched shape, as well as period-style metal fencing and lighting. We also worked in partnership with local stakeholders while we relocated and redesigned neighboring Duffy Park. We incorporated similar design themes and installed an interpretive panel describing the original bridge. In addition, the park gained period-style lighting and amenities including winding sidewalks and a parking area.
Owner/Client
Pennsylvania Department of Transportation
Linear Footage
465 LF
Cost
Engineering: $3 million
Construction: $17.8 million
Services
- Engineering
- Geospatial, Mapping and Survey