Our work for the mixed-use, transit-oriented development project at the Greenbelt Metro Station required multiple services including topographic and property surveys, right-of-way play preparation, roadway and storm drain design, floodplain studies, stormwater management design, erosion and sediment control, traffic signal plans, maintenance of traffic plans, signing and pavement marking plans, landscaping plans, retaining wall and bridge structural plans, construction specifications, cost estimating, and permitting. Working closely with the client to create the right visual impact, we also designed an overpass bridge to allow accessibility to the main entrance from the local road and developed plans for the widening of MD 193 with all associated improvements.