Initial permit requirements for the treatment plant established very stringent discharge requirements that would have required the design and construction of a highly complex wastewater treatment system. By negotiating with MDE on behalf of the client, we obtained a less restrictive discharge permit for the town, allowing for design and construction of a less costly treatment plant system.