Our site/civil engineers and surveyors prepared preliminary plats, development plans, permitting documents, final engineering drawings, and mass grading plans. We designed the site's stormwater management plan, lift stations, potable water and fire systems, and landscape. Our revised land use plan facilitated the developer's desired retail mix. We met accelerated commercial tenant deadlines by simultaneously applying for sustainable designation and processing documents through Orange County's development review committee.